Cover of: Finding of no significant impact on the environmental assessment and programmatic section 4(f) evaluation for Vaughn - Sun River | Montana. Department of Transportation Read Online
Share

Finding of no significant impact on the environmental assessment and programmatic section 4(f) evaluation for Vaughn - Sun River

  • 5 Want to read
  • ·
  • 86 Currently reading

Published by Federal Highway Administration, Montana Division in Helena, Mont? .
Written in English

Subjects:

  • Roads,
  • Highway planning,
  • Environmental aspects,
  • Design and construction

Book details:

Edition Notes

ContributionsUnited States. Federal Highway Administration. Montana Division
The Physical Object
Pagination1 v. (various pagings) :
ID Numbers
Open LibraryOL25659790M
OCLC/WorldCa45833538

Download Finding of no significant impact on the environmental assessment and programmatic section 4(f) evaluation for Vaughn - Sun River

PDF EPUB FB2 MOBI RTF

MONTHLY NEWSLETTER. Highlighting best practices in stewardship and environmental review from around the country. Section Tribal Agreements: Strengthening Government-to-Government Partnerships and Accelerating Project Delivery. Environmental assessment (EA) is the assessment of the environmental consequences (positive negative) of a plan, policy, program, or actual projects prior to the decision to move forward with the proposed action. In this context, the term "environmental impact assessment" (EIA) is usually used when applied to actual projects by individuals or companies and the term "strategic environmental. Draft Environmental Assessment and Finding of No Significant Impact: Rio Grande Rectification Project, Flood Control Improvements International to Riverside Dam Comments due 4/ (20 MB) Final Environmental Assessment Flood Control Improvements Lateral A/Retamal Dike Levee System. 3/ (15 MB). Environmental Assessment and Draft Finding of No Significant Impact for a Proposed New Perimeter Security Fence and Appurtenances at Field Station Kunia August ES-2 Environmental Assessment Executive Summary met. The topside infrastructure at FSK and the operations that it supports would be vulnerable to potential threats.

4 In July , DOE issued a programmatic environmental assessment and Finding of No Significant Impact for the ULP, which a U.S. District Court invalidated on Octo . @article{osti_, title = {Environmental Assessment and Finding of No Significant Impact: Waste Remediation Activities at Elk Hills (Former Naval petroleum Reserve No. 1), Kern County, California}, author = {}, abstractNote = {DOE proposes to conduct a variety of post-sale site remediation activities, such as characterization, assessment, clean-up, and formal closure, at a number of.   Public scoping for this project was initiated in late spring with an environmental assessment produced in fall A Finding of No Significant Impact was signed in December Work to implement this project took place in Tunnel View Overlook Rehabilitation Finding of No Significant Impact (FONSI) [ kb pdf]. Environmental Assessment: Red Willow Great Plains, LLC – Eagle H September i TABLE OF CONTENTS 1. Purpose and Need for the Proposed Action 1 2. Proposed Action and Alternatives 3 Field Camps 3 Access Roads 3 Well Pads 5 Drilling 7 Casing and Cementing 9.

@article{osti_, title = {Finding of no significant impact: Changes in the sanitary sludge land application program on the Oak Ridge Reservation, Oak Ridge, Tennessee}, author = {}, abstractNote = {The U.S. Department of Energy (DOE) has completed an environmental assessment (DOE/EA) that evaluates potential impacts of proposed changes in the sanitary sludge land application program. Finding of No Significant Impact. 1 3 4: – [Reserved] 4 Socio-Economic Impact Assessment/Environmental Justice (See also 7 CFR , Subpart E) Introduction. The information for social impact assessment presented in this section may be challenging to evaluate for smaller, less-complex proposals, therefore. An environmental impact statement (EIS), under United States environmental law, is a document required by the National Environmental Policy Act (NEPA) for certain actions "significantly affecting the quality of the human environment". An EIS is a tool for decision making. It describes the positive and negative environmental effects of a proposed action, and it usually also lists one or. Draft Environmental Assessment and proposed finding of no significant impact. Draft Site Management and Monitoring Plan. Draft EA and proposed FONSI. Draft EPA ODMDS SMMP. 1 June 17 Jun 21 June Loiza Section 14 Project: Final supplemental Environmental Assessment and signed finding of no significant impact.